The sharpest read of Chile's power market.

We measure Chile's entire power system, from Arica to Chiloé, combine its signals and turn them into intelligence so generators, transmission companies, self-generators and investors can decide sooner.

Grid pulse Week 40, as of Oct 2, 2026

Marginal cost, Quillota 220 kV

22.3US$/MWh

−8.2% vs. prior week

Largest gap between neighboring nodes

11.7US$/MWh

Ancoa – Charrúa

Zero-price intervals, 220 kV

49.3%

+2.0 pp vs. prior week

Our read of the week

Nearly half the week at zero marginal cost: 49% of 220 kV intervals. The widest gap between neighboring nodes opens in south-central Chile, between Ancoa and Charrúa (US$11.7/MWh).

Source: Chile's system operator (CEN), real-time marginal cost. Average from 2026-09-26 to 2026-10-02.

11.7US$/MWh

separated Ancoa from Charrúa in week 40.

It is the largest price difference between two neighboring nodes of the grid, averaged over the last seven days. We read every node, every day: where the gap opens, why, and what it means for your contracts and dispatch.

We combine the system's signals to see what is coming.

Prices, operations, regulation and the market move together. We read them together, with more than 25 years of experience in the sector, and turn them into a dated decision before the effect reaches your results.

Weekly Grid Report · previous edition, Sep 18, 2026 – Sep 24, 2026

The regulator's pressure on Chile's grid operator now falls on market participants

Under an action plan ordered in an enforcement proceeding by the electricity regulator (SEC), the system operator now requires participants to bring their platform data up to date by October 15 and to join a trial run from October through December. What used to be routine reporting now becomes evidence.

OASIS clients received it on Sep 25, 2026; it is published here a week later.

Companies in Chile's power sector, and those who negotiate with it, decide with this intelligence.

  • Generadora Metropolitana
  • Guacolda Energía
  • Celeo
  • Quintero Energía
  • Espinos S.A. (Potencia)
  • and other grid participants

See your operation within the whole system.

An initial diagnostic reviews your position in Chile's grid and the signals most likely to move it in the coming months. At no cost, within two weeks.

We work so the power sector decides with an edge, and to accelerate the transition toward a system that runs around the clock, with zero emissions.

Write to us at

[email protected]

Open in Gmail Open in Outlook