From data to decision in Chile's power market.

We measure Chile's entire power system, from Arica to Chiloé, and turn its signals into decisions: to operate, grow, enter the market or protect your assets. With the judgment of people who have run companies in the sector.

Grid pulse Week 45, as of Nov 5, 2026

Marginal cost, Quillota 220 kV

6.1US$/MWh

+6.5% vs. prior week

Hours with the south decoupled

12h

Average gap of US$340/MWh, Cautín – Puerto Montt

Zero-price intervals, 220 kV

59.0%

−1.9 pp vs. prior week

Our read of the week

More than half the week at zero marginal cost: 59% of 220 kV intervals. Southern Chile decoupled for 12 hours: Puerto Montt averaged US$340/MWh above Cautín, with central Chile near zero.

Source: Chile's system operator (CEN), real-time marginal cost. Average from 2026-10-30 to 2026-11-05.

340US$/MWh

separated Cautín from Puerto Montt for 12 hours in week 45.

It is the average gap between two neighboring nodes in the hours when the south split from the rest of the grid, with central Chile near zero. Averaged over the whole week it shrinks to US$29.8/MWh. We read every node, every day: where the gap opens, why, and what it means for your contracts and dispatch.

What's coming in the grid, before it reaches you.

Prices, operations, regulation and the market move together. We read them together, with more than 25 years of experience in the sector, and turn them into a dated decision before the effect reaches your results.

Weekly Grid Report · previous edition, Oct 23, 2026 – Oct 29, 2026

Chile's grid operator tells the regulator it has no say over one of its operating rules

Four industrial companies complained to the Superintendency of Electricity and Fuels (SEC), Chile's power and fuels regulator, about the 10 MW minimum the grid operator has required since April to provide tertiary frequency control. The operator replied that the matter belongs before the Panel of Experts, the sector's dispute-resolution body, and declined to estimate the measure's cost, as the regulator had requested.

OASIS clients received it on Oct 30, 2026; it is published here a week later.

Companies in Chile's power sector, and those who negotiate with it, decide with this intelligence.

  • Generadora Metropolitana
  • Guacolda Energía
  • Celeo
  • Quintero Energía
  • Espinos
  • and other grid participants

See your operation within the whole system.

An initial diagnostic reviews your position in Chile's grid and the signals most likely to move it in the coming months. At no cost, within two weeks.

We work so the power sector decides with an edge, and to accelerate the transition toward a system that runs around the clock, with zero emissions.