From data to decision in Chile's power market.
We measure Chile's entire power system, from Arica to Chiloé, and turn its signals into decisions: to operate, grow, enter the market or protect your assets. With the judgment of people who have run companies in the sector.
Marginal cost, Quillota 220 kV
6.1US$/MWh+6.5% vs. prior week
Hours with the south decoupled
12hAverage gap of US$340/MWh, Cautín – Puerto Montt
Zero-price intervals, 220 kV
59.0%−1.9 pp vs. prior week
Our read of the week
More than half the week at zero marginal cost: 59% of 220 kV intervals. Southern Chile decoupled for 12 hours: Puerto Montt averaged US$340/MWh above Cautín, with central Chile near zero.Source: Chile's system operator (CEN), real-time marginal cost. Average from 2026-10-30 to 2026-11-05.
340US$/MWh
separated Cautín from Puerto Montt for 12 hours in week 45.
It is the average gap between two neighboring nodes in the hours when the south split from the rest of the grid, with central Chile near zero. Averaged over the whole week it shrinks to US$29.8/MWh. We read every node, every day: where the gap opens, why, and what it means for your contracts and dispatch.
What's coming in the grid, before it reaches you.
Prices, operations, regulation and the market move together. We read them together, with more than 25 years of experience in the sector, and turn them into a dated decision before the effect reaches your results.
Weekly Grid Report · previous edition, Oct 23, 2026 – Oct 29, 2026
Chile's grid operator tells the regulator it has no say over one of its operating rules
Four industrial companies complained to the Superintendency of Electricity and Fuels (SEC), Chile's power and fuels regulator, about the 10 MW minimum the grid operator has required since April to provide tertiary frequency control. The operator replied that the matter belongs before the Panel of Experts, the sector's dispute-resolution body, and declined to estimate the measure's cost, as the regulator had requested.
OASIS clients received it on Oct 30, 2026; it is published here a week later.
One intelligence, four ways to put it to work.
Companies in Chile's power sector, and those who negotiate with it, decide with this intelligence.




- and other grid participants
See your operation within the whole system.
An initial diagnostic reviews your position in Chile's grid and the signals most likely to move it in the coming months. At no cost, within two weeks.
Or write to us at [email protected]
Recent analyses
See all analysis-
The attack took a day; getting back on the grid has taken 62 days
Chile's 103 MW Huatacondo solar plant remains offline 62 days after the August 27 cyberattack, and its 98 MW / 312 MWh battery system, then in commissioning, has not been reconnected. In October, three grid-connected companies updated their firewalls.
-
What to do when the Coordinator sends you a letter with a deadline
Letters from the National Electric Coordinator that request information or an action set a deadline, and missing it has consequences. What to check first, what happens if the deadline lapses, and the standard that prevents it.
-
Batteries on Chile's distribution grid: the pending standard will decide when they can charge
Chile's new small-scale generation regulation lets storage charge from the distribution grid. The technical standard in force forbids it, and connections are on hold. What remains to be written is the battery's priority behind end customers, and with it, the business case.
We work so the power sector decides with an edge, and to accelerate the transition toward a system that runs around the clock, with zero emissions.